An overview of some projects

Al-Warar or Al-Haouz Bridge construction project

The project to reconstruct Al-Warar or Al-Hawz Bridge in Anbar Governorate was initiated, with a completion period of only 250 days, under referral number (8239) issued on 04/21/2019. The project was completed and a letter of thanks and appreciation was obtained for the efforts made by the company.

Fallujah construction project

The Fallujah Bridge reconstruction project in Anbar Governorate was initiated, with a completion period of only 150 days, under referral number (17716) issued on 05/16/2019. The project was completed and a letter of thanks and appreciation was obtained for the efforts made by the company.

A project to establish, equip and develop the new Ramadi complex

The new Ramadi complex was equipped and developed with lifting stations and a treatment station, with the possibility of expansion for 360 days to Anbar Governorate, under the direct supervision of the Anbar Governorate Sewer Engineering Department, with a total value amounting to 2,034,321,000, with work implementation contract No. (290) for the year 2019, which includes work on the project to establish a network. Collecting and pumping rainwater.

Project to establish the administration building at the Nasiriyah isolation station

The project to construct the administration building at the Nasiriyah Isolation Station in Dhi Qar Governorate was initiated for the Dhi Qar Oil Company, with a completion period of only 760 days. The work includes the construction of the two-storey building, the construction of internal halls and rooms, in addition to the sanitary units and the kitchen, covering the building from the outside with Baadha stone, and all other matters. Structural, architectural, electrical, mechanical and sanitary works according to schedules and plans approved in advance and under the direct supervision of Dhi Qar Oil Company.

Project for the construction of the Kafa’at Secondary Electricity Transfer Station 11/33 kV

The project to construct a transformer station, F, for the Kafa’at Secondary Electricity Governorate, 11/33 KV, Wasit was initiated. The work includes a secondary power conversion station of 11/33 kV, original. The project was completed and a letter of thanks and appreciation was obtained for the efforts made by the company.

Ocean Street rehabilitation project for a 5 km area in Ramadi

The rehabilitation project of Al-Muhit Street for the 5 km area in Ramadi, Anbar Governorate, was initiated, with a completion period of 210 days and a value of 4,203,960,000, according to technical and engineering specifications and with follow-up by the Anbar Governorate and the Resident Engineer Department.

A project to build low-cost homes: 1,200 homes

The project to build 1,200 low-cost homes was initiated under Contract No. (1) for the year 2019, with a prefabricated construction system with high technical and engineering specifications and the preparation of a high-quality Turkish template, with direct follow-up from the Anbar Governorate Office.

Al-Warar Corniche rehabilitation project from the insurance side

The Al-Warar Corniche rehabilitation project for Anbar Governorate was initiated under Contract No. (176) of 2019. The project was completed with high technical and engineering specifications and a value of 5,846,415,000 billion.